Dodge Journey: Battery System

Description, Operation
DESCRIPTION Fig. 1: Battery Components This vehicle is equipped with a single 12-volt battery. All of the components of the battery system are located in the front of the vehicle, just ahead of ...

See also:

Assembly
Fig. 239: Output Shaft #2 & Needle Bearing 1. Install the reverse needle bearing (1) onto the output shaft # 2 (2). Fig. 240: Synchronizer NOTE: Pay attention to the direction when inser ...

Disassembly
Fig. 28: Identifying Solenoid/Pressure Switch Assembly & Gasket - SOLENOID/PRESSURE SWITCH ASSEMBLY - GASKET NOTE: If transaxle is being overhauled (clutch and/or seal replacement ...

Installation
Fig. 97: Strut Upper Mounting Nuts 1. Raise the strut assembly (2) into the strut tower, aligning the three studs on the strut assembly upper mount with the holes in strut tower. Install the thr ...

0.0121